It's almost the summer, who is behind schedule? :larry:

™BlackPearl The Empress™

Long Live the Empire
Supporter
Joined
Sep 30, 2013
Messages
47,862
Reputation
20,532
Daps
191,815
IMG-1838.jpg


@Kasgoinjail
:umad: :mjlol: :flabbynsick:
That can't be her. Tell me you're lying.

OMG that's a tragic face.
 

"It Was Always Jerry"

New Season, Same Problem
Joined
Jan 18, 2014
Messages
3,412
Reputation
1,217
Daps
6,084
Reppin
Everywhere
I need to get in shape. I'm out here with the BossMan Dlow build. I was at the Bank, this past Thursday, with my favorite Versace tee. Looked at the lil side mirror and saw how much weight I put on. :mjcry: My Versace tee was stretched out so much, the 'CE in VERSACE was damn near on my back.
 
Top