hold up... dubai doesn't have a working sewage system in their country?

Paper Boi

Veteran
Supporter
Joined
May 15, 2013
Messages
73,447
Reputation
24,598
Daps
479,885
Reppin
NULL

Dubai's Burj Khalifa doesn't have a sewage system - so trucks pump out poo every day​

The Burj Khalifa is the tallest building in the world and cost $130 billion to make but it is not connected to Dubai's sewage system and so every day a platoon of trucks queue up to remove its poo


a

The tallest building in the world relies on poo trucks to remove its sewage (Image: Getty Images)

Dubai is the flashiest place in the world, a desert metropolis home to the tallest skyscraper in the world: the Burj Khalifa.
The shimmering spike of glass is the largest building in the world and stands at an awe-inspiring 830 meters, making it 500 meters taller than our own effort, London's Shard.
However, there's one thing our biggest building has that the Burj sorely lacks and that's a working sewage system.
Because although the Burj is undoubtedly impressive it is not hooked up to the city's wastewater system and therefore has had to come up with a creative if disgusting way to remove its sewage.

Every day, a collection of literal poo trucks make their way to the shimmering tower and are burdened with the building's sewage.

A

The orange poo trucks of Dubai (Image: youtube.com/watch?v=b5_8Q4X05ME)

This waste is then transported out of the city in the smelliest platoon imaginable.


Now you might be wondering why anybody would spend $1.5 billion on a skyscraper without ensuring there's a system in place to remove its waste.
Well as it transpires, the Burj is far from alone when it comes to its arrangement.

When the Burj was completed Dubia was reeling from the impacts of the 2008 credit crunch and it was decided that the cost of adding it to the city's already strained sewer system was an unnecessary waste of money.

A

Dubai is re-developing their sewage system (Image: Getty Images)

The developers were confident that trucking the waste out every day would be cheaper than making the improvements to the sewer system in the short tonne.
However, with a possible residency of 35,000 people, the building is capable of producing a staggering 15 tonnes of sewage a day.
There are now plans to re-develop the sewage system but it will not be completed until 2025.
So if you do visit the Burj, keep an eye out for the convoy of orange trucks and maybe close the windows.

no wonder they using IG models as toilets

full
 

Buddy

Keep my name out of it
Bushed
Joined
Apr 28, 2014
Messages
18,383
Reputation
5,573
Daps
76,737
It sounds like they DO have plumbing, they just don't have it at the Burj Khalifa-- which is still insane.

A former coworker went and gifted me a souvenir statue of that buiding, now I'm wondering wtf happened to it :martin:
 

karim

Superstar
Joined
Dec 2, 2012
Messages
10,895
Reputation
-85
Daps
40,791
Reppin
NULL

Dubai's Burj Khalifa doesn't have a sewage system - so trucks pump out poo every day​

The Burj Khalifa is the tallest building in the world and cost $130 billion to make but it is not connected to Dubai's sewage system and so every day a platoon of trucks queue up to remove its poo


a

The tallest building in the world relies on poo trucks to remove its sewage (Image: Getty Images)

Dubai is the flashiest place in the world, a desert metropolis home to the tallest skyscraper in the world: the Burj Khalifa.
The shimmering spike of glass is the largest building in the world and stands at an awe-inspiring 830 meters, making it 500 meters taller than our own effort, London's Shard.
However, there's one thing our biggest building has that the Burj sorely lacks and that's a working sewage system.
Because although the Burj is undoubtedly impressive it is not hooked up to the city's wastewater system and therefore has had to come up with a creative if disgusting way to remove its sewage.

Every day, a collection of literal poo trucks make their way to the shimmering tower and are burdened with the building's sewage.

A

The orange poo trucks of Dubai (Image: youtube.com/watch?v=b5_8Q4X05ME)

This waste is then transported out of the city in the smelliest platoon imaginable.


Now you might be wondering why anybody would spend $1.5 billion on a skyscraper without ensuring there's a system in place to remove its waste.
Well as it transpires, the Burj is far from alone when it comes to its arrangement.

When the Burj was completed Dubia was reeling from the impacts of the 2008 credit crunch and it was decided that the cost of adding it to the city's already strained sewer system was an unnecessary waste of money.

A

Dubai is re-developing their sewage system (Image: Getty Images)

The developers were confident that trucking the waste out every day would be cheaper than making the improvements to the sewer system in the short tonne.
However, with a possible residency of 35,000 people, the building is capable of producing a staggering 15 tonnes of sewage a day.
There are now plans to re-develop the sewage system but it will not be completed until 2025.
So if you do visit the Burj, keep an eye out for the convoy of orange trucks and maybe close the windows.

no wonder they using IG models as toilets

full
Very fitting metaphor for Dubai :yeshrug:
 
Top